Opportunity intelligence across contractor markets.
Each market cares about different signals. The point is not a generic project dump. The point is a weekly filter that shows where your crew, estimating time, relationships, service capacity, or buyer need may actually matter.
Plumbing
Useful for teams watching remodels, tenant improvements, service upgrades, schools, multifamily, hospitality, facilities, and public building work.
Signals to watch
- Permit clusters and remodel activity.
- School, municipal, and facility upgrades.
- GC-led projects needing specialty trades.
Why it helps
- Plumbing scope hides inside larger jobs.
- Early GC outreach can beat quote-week panic.
- Service and project work have different signals.
Next action
- Identify likely GC or owner.
- Check schedule and inspection requirements.
- Decide whether to quote, watch, or pass.
HVAC / Mechanical
Useful for shops watching replacements, retrofits, controls, energy work, public buildings, commercial facilities, schools, and maintenance cycles.
Signals to watch
- Budgeted HVAC replacements.
- Energy efficiency or controls work.
- Facility maintenance renewals.
Why it helps
- Mechanical work is often planned before formal bidding.
- Owners reveal needs through budgets and meetings.
- Service relationships can precede project work.
Next action
- Verify equipment and scope clues.
- Find the facility or owner contact.
- Prioritize projects that match crew capacity.
General Contracting
Useful for GCs that need earlier project visibility, better subcontractor maps, and cleaner bid/no-bid decisions across public and private work.
Signals to watch
- Owner planning and budget approvals.
- Permits, design movement, and RFQs.
- Agency, school, facility, and private demand.
Why it helps
- GCs win by timing and relationships.
- Sub availability can decide pursuit quality.
- Bad-fit jobs waste entire estimating teams.
Next action
- Qualify owner, scope, and schedule.
- Map likely specialty trade needs.
- Start partner outreach early.
Framing
Useful for framers watching housing, multifamily, commercial build-outs, school additions, private developments, and GC-led packages.
Signals to watch
- Permit and development activity.
- Multifamily and light commercial starts.
- GC bid packages needing framing scope.
Why it helps
- Framing demand moves before traditional sources show it.
- Labor planning matters.
- Repeat GC relationships compound.
Next action
- Identify GC and timeline.
- Check volume and crew fit.
- Prioritize repeat-buyer opportunities.
Roofing
Useful for roofers watching facility maintenance, public buildings, schools, storm recovery, capital plans, inspections, and replacement cycles.
Signals to watch
- Roof assessments and leak reports.
- School and facility capital plans.
- Insurance, storm, and maintenance activity.
Why it helps
- Roof needs are visible before procurement.
- Maintenance signals can become replacement work.
- Timing affects material and crew planning.
Next action
- Verify owner and roof type.
- Watch for bid or quote release.
- Start relationship outreach early.
Low-Voltage
Useful for teams watching security, access control, data, fiber, AV, surveillance, public facilities, schools, healthcare, and commercial upgrades.
Signals to watch
- School safety and access-control projects.
- Facility technology upgrades.
- Data, fiber, AV, and security scope clues.
Why it helps
- Low-voltage scope is easy to miss in large packages.
- Security and IT needs create repeat demand.
- Early owner context improves quoting.
Next action
- Verify system type and buyer.
- Identify prime or owner contact.
- Track addenda and scope clarifications.
Fire Protection
Useful for sprinkler, alarm, inspection, and life-safety teams watching remodels, new construction, schools, facilities, and code-driven upgrades.
Signals to watch
- Building permits and remodels.
- Life-safety upgrades.
- Inspection and compliance cycles.
Why it helps
- Code needs force buying decisions.
- Fire scope often follows facility changes.
- Service contracts can lead to project work.
Next action
- Verify building type and authority.
- Check whether scope is design, install, or service.
- Qualify requirements before quoting.
Traffic Signal
Useful for signal, ITS, lighting, and electrical teams that need to see transportation work before the quote request becomes urgent.
Signals to watch
- Intersection upgrades.
- Signal timing or cabinet work.
- ITS, lighting, conduit, and detection scope.
Why it helps
- Find projects before bid week.
- Identify primes and planholders earlier.
- Check prequalification and addenda timing.
Next action
- Verify electrical/signal scope.
- Decide whether to quote or pass.
- Contact likely primes while there is time.
Civil
Useful for small and mid-size civil contractors trying to filter roadway, utility, sitework, drainage, public, and private packages by market and project size.
Signals to watch
- Roadway rehabilitation.
- Drainage and utility work.
- Municipal and private site improvements.
Why it helps
- Cut through scattered sources.
- Spot jobs that fit crew size.
- Avoid wasting time on poor-fit scopes.
Next action
- Review source documents.
- Check bonding and schedule constraints.
- Build a pursue/watch/pass list.
Sitework
Useful for teams watching grading, drainage, utilities, pads, access roads, commercial sites, public facilities, and private development starts.
Signals to watch
- Site plans and development approvals.
- Utility coordination and drainage work.
- GC packages with early civil scope.
Why it helps
- Sitework often starts before vertical trades.
- Early mobilization planning matters.
- Good-fit geography saves margin.
Next action
- Confirm scope and location.
- Map owner, engineer, and GC.
- Check timing against equipment availability.
Excavation
Useful for excavators watching development starts, utility trenches, drainage, road work, site prep, demolition follow-on work, and emergency repairs.
Signals to watch
- Permits and site preparation.
- Utility and drainage projects.
- Road, facility, and development activity.
Why it helps
- Equipment scheduling can make or break fit.
- Earthwork signals appear before many trades.
- Nearby clusters improve utilization.
Next action
- Verify access and quantities.
- Check soil, hauling, and schedule risks.
- Prioritize by location density.
Concrete
Useful for contractors watching curb, sidewalk, ADA ramp, flatwork, foundations, drainage, roadway, facility, and site improvement work.
Signals to watch
- ADA curb ramp packages.
- Sidewalk, curb, slab, and foundation work.
- Concrete scope inside larger jobs.
Why it helps
- Catch sub scopes early.
- Filter by geography and project size.
- See whether the work is standalone or prime-led.
Next action
- Check quantities and specs.
- Identify prime or buyer.
- Decide whether to request plans.
Utilities
Useful for contractors watching water, sewer, storm, dry utilities, service extensions, public utility districts, private development, and emergency repairs.
Signals to watch
- Capital improvement plans.
- Utility conflicts and relocations.
- Development-driven extensions.
Why it helps
- Utility work reveals future phases.
- Agencies and developers signal demand early.
- Specialized crews need advance planning.
Next action
- Verify utility type and owner.
- Check prequalification and licensing.
- Map related future work.
Asphalt
Useful for paving and resurfacing teams watching roadway rehab, parking lots, patching, milling, chip seal, and maintenance opportunities.
Signals to watch
- Pavement rehabilitation.
- Milling, overlay, patching, and chip seal.
- Street, lot, and facility maintenance packages.
Why it helps
- Filter by geography and work type.
- See which jobs include traffic control or striping.
- Plan estimating attention around timing.
Next action
- Verify quantities and material specs.
- Check addenda and prebid notes.
- Prioritize jobs that fit crew availability.
Traffic Control
Useful for traffic-control and striping teams that want to see roadway, utility, maintenance, and construction work early enough to quote cleanly.
Signals to watch
- Roadway and utility work.
- Lane closures and safety packages.
- Striping, markings, and temporary traffic control.
Why it helps
- Prime outreach often happens late.
- Planholder data reveals who may need quotes.
- Timing helps prioritize follow-up.
Next action
- Identify likely primes.
- Check traffic-control sheets and addenda.
- Quote before the last-minute rush.
Facility Maintenance
Useful for companies watching recurring work, repair cycles, janitorial, HVAC service, roofing repairs, painting, plumbing, electrical service, and owner needs.
Signals to watch
- Maintenance contract renewals.
- Facility budgets and board agendas.
- Repair history and capital plans.
Why it helps
- Recurring work can stabilize revenue.
- Facilities reveal needs before RFPs.
- Service work can lead to project work.
Next action
- Identify facility contact or buyer.
- Qualify service area and response needs.
- Track renewal timing.
Landscaping
Useful for landscape, irrigation, erosion control, parks, public grounds, commercial maintenance, and site restoration teams.
Signals to watch
- Parks and grounds budgets.
- Commercial site completions.
- Irrigation, erosion, and restoration scopes.
Why it helps
- Landscape scope follows development and civil work.
- Maintenance renewals recur.
- Seasonality makes timing important.
Next action
- Verify scope and season.
- Identify owner or property manager.
- Watch for recurring maintenance windows.
Demolition
Useful for demo teams watching remodels, redevelopment, abatement, public facility updates, disaster recovery, and private project starts.
Signals to watch
- Redevelopment and permit activity.
- Facility renovation plans.
- Abatement and selective demo scopes.
Why it helps
- Demo often precedes visible construction.
- Hazard and disposal needs affect fit.
- Early owner context reduces surprise risk.
Next action
- Verify materials and disposal constraints.
- Identify GC, owner, or agency.
- Check schedule and access.
Painting / Finishes
Useful for finish contractors watching remodels, turnovers, facility maintenance, public buildings, schools, retail, hospitality, and GC packages.
Signals to watch
- Renovations and tenant improvements.
- Facility maintenance and refresh cycles.
- GC bid packages with finish scope.
Why it helps
- Finish work appears late if you wait.
- Owner and GC relationships compound.
- Small scopes can still be profitable.
Next action
- Identify owner or GC.
- Verify schedule and surface scope.
- Prioritize repeat buyers.
ADA / Accessibility
Useful for contractors that want to track accessibility upgrades tied to sidewalks, buildings, schools, transit, facilities, and right-of-way work.
Signals to watch
- ADA ramp upgrades.
- Facility access improvements.
- Sidewalk and right-of-way compliance projects.
Why it helps
- Accessibility work can hide inside broader packages.
- Compliance pressure creates recurring demand.
- Small scopes may still fit well.
Next action
- Verify scope and standards.
- Check location density.
- Confirm schedule and inspection requirements.
Start with a weekly brief.
Starter is $79/month. Pro is $249/month if you want tighter filters by trade, geography, buyer type, project size, source type, and timing horizon.